Pertamina Ports
| BALIKPAPAN / BPP |
Posisi Koordinat : 01º 15' 10" LS / 116° 48' 30" BT, Operator : PT. Pertamina (Persero) Marine UP. V Balikapapan, Pengawas : PT.Pertamina (Persero) Marine UP. V Balikpapan, Alamat : PT.Pertamina
(Persero) Marine UP. V Balikpapan, Jl. Yos Sudarso No. 1 Balikpapan - 76111, Kalimantan Timur -
Indonesia, Telepon : (0542) - 51 5650 / 51 5600, Email : -, Facimile : (0542) -
51 5688 / 51 5639, Telex : ......., ISPS
Code : Comply, PSO : Telephone kantor 0542 - 422872, PFSO : Telephone kantor : 0542 -
515650, Rumah : 0542 - 517276, Peta Laut Indonesia : No. 130, 157, Inggris : No. 3031, 3014, 2636 & 2637, Waktu Tolok Setempat : UTC + 8 jam, Waktu
Operasi : Masuk/ keluar & tambat / lepas tambat 24 jam, Pemanduan : Diwajibkan untuk kapal 70 GRT keatas, Pelayanan Pandu : 6
jam sebelum tiba & 3 jam sebelum berangkat, Posisi berlabuh :
Menunggu Pandu Laut : 01º 20' 45" LS / 116°
56' 00" BT, Menunggu Pandu Bandar : 01º 16' 45" LS / 116° 48' 30" BT,
Menunggu Sandar : 01º 16' 45" LS / 116°
48' 30" BT, Kedalaman
Alur : Ambang Luar = 16 mLWS, Masuk / keluar
= 13 mLWS, Ambang dalam = 12 mLWS, Kolam
Pelabuhan = 12 mLWS & terkecil = 10 mLWS, Jenis Dasar Laut : Pasir, Lumpur. Jarak
aman dibawah lunas : 0,5 m, Pasang Surut : Muka surutan (Zo) = 2,6
mLWS, terkecil = 1,6 m dan terbesar = 2,8 mLWS, Arus : Air pasang
= .... jam, arah 310° - 355°, kecepatan =
1.0 knots, Air surut = .... jam, arah 115°
- 150°, kecepatan = 1,5 knots, Bahaya Navigasi :
Wreck MT. Sun Salviano : 01º 16' 17,6"
LS / 116° 47' 43" BT, Pejabat Pelabuhan : Adpel/Syahbandarl, Kesehatan Pelabuhan, Bea dan Cukai &
Imigrasi ada, Kapasitas
Tangki : Avtur = 7.500 T, Premium = 8.100 T,
Kerosine = 17.000 T, HSD = 12.870 KL, Napta = 14.800 T, ADO = 1.700 T, IDO =
4.900 T, HSD = 12.870 KL, MFO = 2.200
KL, MDF = 6.045 KL & Crude Oil = 27.000 Ton, Sarana Bantu Tambat : Kapal Tunda = 1 x 2.400 PK =+ 1 x 2.200 PK + 1 x 1.700 PK, Kapal Kepil = 2 x 125 PK + 1 x 95 PK, Launch
Boat = 2 x 960 PK & Speed Boat = 2 x 45 PK, Alat Pemadam api : Instalasi Fire Hydrant & bahan kimia Extinguieser & Foam,
Kapal Pemadam Api : Ada = 2 x 750 PK, Alat Penanggulangan - Tumpahan
Minyak : Oil Boom = 1.600 m, Oil Skimmer
= 7 Unit, Oil Contaiment Bag = 3 Unit @
51 M3, Oil Dispersant Pump = 5 Unit , Oil Dispersant Chemical = 3.800 ltr
& Oil Sorbant = 1 Box. & Hand Spray = 2 Unit, Fasilitas Air Tawar : Max = 150 T, min
= 15 T,Melalui Tongkang, dia.selang = 4", rate/jam = 15 Ton, Fasilitas Bahan bakar : HSD, MFO & MDF melaui Pipa, Dia. 6" - 8", Rate/jam = 150 -
300 KL, Fasilitas
penampungan - Air / Minyak Kotor : Ada
kapasitas tangki = 37.400 KL, Kapasitas pemompaan = 1.500 KL Dia. Pipa = 8" -
10", Melalui pipa, Fasilitas
Crane : Crane darat = 1 x 40 T, Crane Mobil = 2 x 50 T + 1 x 15 T &
1 x 6 T, Crane Apung = 1 x 60 Ton, Galangan
Kapal : Ada dock darat = 200Ton, Penumpukan Barang : Gudang & lapangan terbuka ada, Fasilitas Makanan : Basah & kering ada, Rumah Sakit / Klinik : Ada, Hujan : Bulan Oktober, Curah hujan max. 335 mm / min. 150 mm cuaca
terburuk bulan Juni, Desember angin
kuat, Angin : - Bulan
Desember s/d Pebruari, arah BL / U / TL / T, kecepatan 5 - 10 knots, Bulan
Maret s/d Mei, arah T / S / BL, Kecepatan 2 - 6 knots, - Bulan Juni s/d
Agustus, arah S / SM, kecepatan 0,5 - 1,5 knots, - Bulan September s/d
Nopember, arah S /SM / BL kecepatan 0,5 - 10
knots.Komunikasi Radio : HF / MF: Balikpapan Radio, PKN - 2, Daya kekuatan 1 KW, Posisi Antena : 01º 15' 09" LS / 116° 49' 28" BT, Pantai Frekwensi ( Lihat daftar Stasiun Radio Pantai ), VHF : Balikpapan Radio, PKN - 2, Daya kekuatan 50 W, Ch. 9 - 156.45, Ch. 16 - 156.80 & Ch. 19 -161.55 MHZ, Sarana Tambat : Dermaga 1 : 01º 16' 12.5" LS / 116° 48' 30" BT, Kedalaman air 9 m DWT min.1.500 T, max. 3.500 T, LOA 190 m, Muatan & Kec.Muat / Bongkar: Crude Oil = 1.000 KL, LSWR = 1.200 KL, HSD = 400 KL, MFO = 250 KL & MDO = 250 KL, Dia. LA / Selang 10" / 8", Dermaga 2 : 01º 16' 08" LS / 116° 48' 35" BT, Kedalaman air = 12 m, DWT 1.500 T s/d 35.000 T, LOA : 190 m, Muatan & Kec. Muat / Bongkar : Crude Oil = 1.000 KL, LSWR = 1.200 KL, Avtur = 800 / 500 KL, Kerosine = 300 / 800 KL, Premium = 150 / 500Kl, HSD = 300 KL, IDO = 200 / 350 KL & IFO = 800 KL, Dia. LA / Selang 8" / 10", Dermaga 3 : 01º 16' 04" LS / 116° 48' 40" BT, Kedalaman air = 12 m, DWT 1.500 T s/d 35.000 T, LOA : 190 m, Muatan & Kec. Muat / Bongkar : Crude Oil = 1.000 KL, LSWR = 1.200 KL, Avtur = 300 / 500 KL, Kerosine = 500 / 800 KL, Premium = 300 / 500Kl, HSD = 400/500 KL, MFO = 250 / 350 KL & MDF = 500 KL, Dia. LA / Selang 8" / 10", Dermaga 4 : 01º 15' 58" LS / 116° 48' 42" BT,Kedalaman air = 12 m, DWT 1.500 T s/d 35.000 T, LOA : 190 m, Muatan & Kec. Muat / Bongkar : Crude Oil = 1.000 KL, LSWR = 1.200 KL, Avtur = 500 / 1500 KL, Kerosine = 800 / 1500 KL, Premium = 500 / 1500Kl, HOMC = 400/250 KL,HSD = 400/500 KL, MFO = 250 / 350 KL & MDF = 500 KL, Dia. LA / Selang 6" / 10", Dermaga 5 : 01º 15' 52" LS / 116° 48' 44" BT,Kedalaman air = 12 m, DWT 1.500 T s/d 35.000 T, LOA : 190 m, Muatan & Kec. Muat / Bongkar : Crude Oil = 1.000 KL, LSWR = 1.200 KL, Avtur = 500 / 1500 KL, Kerosine = 800 / 1500 KL, Premium = 500 / 1500Kl, HOMC = 400/250 KL,HSD = 800/1500 KL, MFO = 250 / 350 KL & MDF = 500 KL, Dia. LA / Selang 6" / 10", Dermaga 5A : 01º 15' 37" LS / 116° 48' 59" BT, Kedalaman air = 2,5 m, DWT 5000 T , LOA : 110 m, Muatan & Kec. Muat Avtur = 1500 KL, Kerosine = 1500 KL, Premium = 1500 Kl, Gasoli = 1500 KL, ADO = 2500 KL, IDO = 1500 KL, FO = 1500 KL, Dia.Selang 6" / 10", Dermaga 5B : 01º 15' 44" LS / 116° 48' 45" BT,Kedalaman air = 12,6 m, DWT 1.200 T s/d 35.000 T, LOA : 190 m, Muatan & Kec. Muat LPG = 250 M³, Avtur = 1500 KL, Kerosine = 1500 KL, Premium = 1500 Kl, Gasolin = 1500 KL, NAPTHA = 1500 KL, ADO = 2500 KL, IDO = 1500 KL, FO = 1500 KL, Dia.Selang 9" / 10", Dermaga 5B : 01º 15' 37" LS / 116° 48' 47" BT Data sama dg dermaga 5C, Dermaga 6 / 7 : 01º 15' 20" LS / 116° 48' 48" BT Kedalaman air = 10 m, DWT Maks 35000 T , LOA maks 213 m Dermaga Cargo, Dermaga 7A : 01º 15' 20" LS / 116° 48' 48" BT Kedalaman air = 10 m, DWT Maks 10.000 T , LOA maks 120 m Dermaga Cargo, Sarana Bantu Navigasi : Lihat Daftar Suar dan Peta Laut Indonesia, Berat Jenis Air : 1.025, ETA Kapal : 6 jam sebelum tiba, 3 jam sebelum tiba, Dokumen Kapal :
Fasilitas Perbaikan : Tidak tersedia, Penampungan Sampah - Dari kapal : Tidak tersedia. Transportasi : - Terminal Bus ± 5 Km, Nama ..........., - Bandar Udara ± 8 Km, Nama Bandara Sepinggan, Lay Out Dermaga : Ada, Lain - lain : Crew Sign On / Off, Bank, Hotel & travel ada.
|
|||||||||||||||||||||||||||||||||||||
Posisi Koordinat : 01º 15' 10" LS / 116° 48' 30" BT, Operator : PT. Pertamina (Persero) Marine UP. V Balikapapan, Pengawas : PT.Pertamina (Persero) Marine UP. V Balikpapan, Alamat : PT.Pertamina
(Persero) Marine UP. V Balikpapan, Jl. Yos Sudarso No. 1 Balikpapan - 76111, Kalimantan Timur -
Indonesia, Telepon : (0542) - 51 5650 / 51 5600, Email : -, Facimile : (0542) -
51 5688 / 51 5639, Telex : ......., ISPS
Code : Comply, PSO : Telephone kantor 0542 - 422872, PFSO : Telephone kantor : 0542 -
515650, Rumah : 0542 - 517276, Peta Laut Indonesia : No. 130, 157, Inggris : No. 3031, 3014, 2636 & 2637, Waktu Tolok Setempat : UTC + 8 jam, Waktu
Operasi : Masuk/ keluar & tambat / lepas tambat 24 jam, Pemanduan : Diwajibkan untuk kapal 70 GRT keatas, Pelayanan Pandu : 6
jam sebelum tiba & 3 jam sebelum berangkat, Posisi berlabuh :
Menunggu Pandu Laut : 01º 20' 45" LS / 116°
56' 00" BT, Menunggu Pandu Bandar : 01º 16' 45" LS / 116° 48' 30" BT,
Menunggu Sandar : 01º 16' 45" LS / 116°
48' 30" BT, Kedalaman
Alur : Ambang Luar = 16 mLWS, Masuk / keluar
= 13 mLWS, Ambang dalam = 12 mLWS, Kolam
Pelabuhan = 12 mLWS & terkecil = 10 mLWS, Jenis Dasar Laut : Pasir, Lumpur. Jarak
aman dibawah lunas : 0,5 m, Pasang Surut : Muka surutan (Zo) = 2,6
mLWS, terkecil = 1,6 m dan terbesar = 2,8 mLWS, Arus : Air pasang
= .... jam, arah 310° - 355°, kecepatan =
1.0 knots, Air surut = .... jam, arah 115°
- 150°, kecepatan = 1,5 knots, Bahaya Navigasi :
Wreck MT. Sun Salviano : 01º 16' 17,6"
LS / 116° 47' 43" BT, Pejabat Pelabuhan : Adpel/Syahbandarl, Kesehatan Pelabuhan, Bea dan Cukai &
Imigrasi ada, Kapasitas
Tangki : Avtur = 7.500 T, Premium = 8.100 T,
Kerosine = 17.000 T, HSD = 12.870 KL, Napta = 14.800 T, ADO = 1.700 T, IDO =
4.900 T, HSD = 12.870 KL, MFO = 2.200
KL, MDF = 6.045 KL & Crude Oil = 27.000 Ton, Sarana Bantu Tambat : Kapal Tunda = 1 x 2.400 PK =+ 1 x 2.200 PK + 1 x 1.700 PK, Kapal Kepil = 2 x 125 PK + 1 x 95 PK, Launch
Boat = 2 x 960 PK & Speed Boat = 2 x 45 PK, Alat Pemadam api : Instalasi Fire Hydrant & bahan kimia Extinguieser & Foam,
Kapal Pemadam Api : Ada = 2 x 750 PK, Alat Penanggulangan - Tumpahan
Minyak : Oil Boom = 1.600 m, Oil Skimmer
= 7 Unit, Oil Contaiment Bag = 3 Unit @
51 M3, Oil Dispersant Pump = 5 Unit , Oil Dispersant Chemical = 3.800 ltr
& Oil Sorbant = 1 Box. & Hand Spray = 2 Unit, Fasilitas Air Tawar : Max = 150 T, min
= 15 T,Melalui Tongkang, dia.selang = 4", rate/jam = 15 Ton, Fasilitas Bahan bakar : HSD, MFO & MDF melaui Pipa, Dia. 6" - 8", Rate/jam = 150 -
300 KL, Fasilitas
penampungan - Air / Minyak Kotor : Ada
kapasitas tangki = 37.400 KL, Kapasitas pemompaan = 1.500 KL Dia. Pipa = 8" -
10", Melalui pipa, Fasilitas
Crane : Crane darat = 1 x 40 T, Crane Mobil = 2 x 50 T + 1 x 15 T &
1 x 6 T, Crane Apung = 1 x 60 Ton, Galangan
Kapal : Ada dock darat = 200Ton, Penumpukan Barang : Gudang & lapangan terbuka ada, Fasilitas Makanan : Basah & kering ada, Rumah Sakit / Klinik : Ada, Hujan : Bulan Oktober, Curah hujan max. 335 mm / min. 150 mm cuaca
terburuk bulan Juni, Desember angin
kuat, Angin : - Bulan
Desember s/d Pebruari, arah BL / U / TL / T, kecepatan 5 - 10 knots, Bulan
Maret s/d Mei, arah T / S / BL, Kecepatan 2 - 6 knots, - Bulan Juni s/d
Agustus, arah S / SM, kecepatan 0,5 - 1,5 knots, - Bulan September s/d
Nopember, arah S /SM / BL kecepatan 0,5 - 10
knots.







